Our services

Structure Preparation and Execution

Steelmont Construction a.s. is one of the well established construction companies, having a solid background, a perspective team of experienced employees and a wide range of highly-qualified external partners. This set-up constitutes a fundamental condition when rendering complex services in the field of structure preparation and execution. What does this mean in practice? Let’s take a closer look:

a.) Analysis and understanding of a client’s conception

b.) Selection of and proposal for a suitable site in the desired location

c.) Preparation of the action


- a detailed survey of the current condition of building facilities
- obtaining requirements of public and legal bodies
- environmental assessment and conditions - EIA

d.) Drawing up a draft of the structure with respect to

- the environment
- economics
- architecture
- desired structural design with regard to facility functionality
- thermotechnical requirements
- fire requirements
- technological requirements
- occupational safety and health protection

e.) Preparation of project documentation by phase as dictated by law

f.) Preparation of documents for site sub-contractor selection

g.) The actual construction execution

We launch the implementation :
- by equipping the construction site
- by establishing connections of utilities necessary for the execution according to the volume of work to be conducted on the construction
- providing for access roads

And then, we continue:

- by terrain adjustments
- construction of the foundations
- erection the main structure
- assembling cladding
- by horizontal and vertical structures – wet processes
- opening fillings
- industrial and utility floors
- utility lines
- landscaping and roads
- hard surfaces with emphasis on the quality and fulfillment of the investor’s requirements in all implementation steps, in particular in the final production part

h.) Handover of a operative building to the client

- revision reports and construction-part functionality checks
- completion of documentation
-handover and takeover according to protocol